Hydroseeders are widely used in highway slope protection, embankment biological protection and large-scale greenfield reconstruction.
Easy lawn hydroseeder working on site step as the followings:
1. Before you start, first clear the slope. Usually using tools to remove gravel, pumice, dangerous rock to make it flat.
2. Bolt selection bolt length of about 1-2m. Its function is two fixed slopes, easy to hang the net. If the slope is too steep, it is hanging beams.
3. Hang up the net. Usually we use barbed wire or three-dimensional net. If there is a ditch at the top of the ramp, the net ditch is better placed under the ditch to prevent landslides. Hanging network, the top slope leaves 20-750 pixels, the film 500px. Mesh and mesh overlap 1-2 cm with staples or lines;
4. Use a hydroseed sale of the sprayed substrate mixture. Spray from front: from top to bottom, from left to right. Avoid spraying from bottom to top. Finally spray the mixture of soil, pulp or wood fiber, water retaining agent, adhesive, and weeds. Thickness of about 0.5-25px or so.
5. Cover non-woven (16 ~ 18g / m2)
After spraying, cover the slope from top to bottom using nonwoven fabric. Is conducive to moisture, moisture. Nonwoven fabric density requires 15-18g / m2
6. Maintenance management: the main work for the spray, irrigation, fertilization and pest control.
7. Nonwovens Nonwovens. 10-20 days later, the grass appears on the slope, if the non-woven non-degradation, with artificial methods to open non-woven, is conducive to plant growth.